RECA Training Course
Advanced Diploma in Property & Facilities Management
EXAMINATION
Module 2: Building Structures & Services Technology & Maintenance
Time Allowed: 2 hours
Instructions:
This examination paper comprises Parts A & B
Part A: Answer All Multiple Choice Questions (MCQ) (50 marks)
Part B: Answer All Long Questions (50 marks).
The total marks for this examination paper is 100 marks
0 of 28 questions completed
Questions:
You have already completed the review question before. Hence you can not start it again.
Review Question is loading…
You must sign in or sign up to start the review question.
You must first complete the following:
Time has elapsed
The following type of glass can be installed without a frame:
What stresses are cantilever reinforced concrete slabs subjected to in service use?
Which of the following can improve the adhesion of plaster to concrete surfaces?
The following factors directly affect the number and incidence of defects in a building:
The moisture occurring on stainless metal surfaces of an aircon office lobby is probably due to:
Which of the following structural form is commonly adopted for Singapore buildings?
Which of the following statements is NOT TRUE?
What are the functions of kerbs?
Which statement below is TRUE?
The three performance requirements of a building/component are generally classified as:
A Property Executive can take the following measure to reduce pest issues:
A main reason to adopt central air-conditioning systems is:
Hot water pipes should be made of:
A suspended reinforced concrete ground floor slab is supported by
The following methods are adopted to protect a fire-escape stairs in event of a fire:
Measure/s to promote good indoor air quality is/are:
Which of the following elements in a framed building is not a load-bearing member?
The certificate that an owner must obtain from BCA to commence the use of a newly constructed building is:
Which of the following does not require a 3-phase electrical supply?
Reason/s for poor water pressure in a 21-metre high hospital building include/s:
Which of the following statement is TRUE of a single storey wooden framed structure sitting on good sub-soil?
The four main components of most paints are:
Which of the materials below is suitable for constructing external load bearing walls of a 20-storey building?
Which of the following party is qualified to submit planning approval for a building development project?
The purpose of soaking ceramic tiles in water before they are laid is to
List and name the differences in the components/sub-components and materials of a low-rise walk up apartment and a high rise condominium project (refer to the photos below for reference)
This response will be reviewed and graded after submission.
You have been deployed to the high-rise condominium project. Make a list of the Hard and Soft FM work you expect to oversee and co-ordinate in this development over a 12 month period.
The list must include purpose, outcome and frequency (if applicable) of each work activity identified.
This response will be reviewed and graded after submission.
The SPs in the condominium have approved the construction of an open pavilion in the vicinity of the swimming pool at its last AGM.
The MC is considering the two proposed designs shown below:
Steel Structure with Corrugated Metal Timber Structure with Clay Roof Tiles
Roofing and Concrete Floor and Timber Strip Flooring
They would like the pavilion to be constructed in the fastest possible time and have low maintenance costs
a) The MC would like advice on the relative merits of the two proposed designs and provide a recommendation on the design they should consider. ( 10 marks )
b) Prepare a Method Statement with particular emphasis on workplace safety and health procedures to safeguard the well-being of the residents in the execution of the work. (Note: This method statement will be used to evaluate the Contractor’s proposal). (10 marks)
This response will be reviewed and graded after submission.